|
|
正扬热轧托盘运输装置运抵宝武铝业安装现场Pallet transport device Installation site正扬热轧托盘运输装置在本月中旬运抵安装现场,随即开始安装,以下为安装现场。 Zhengyang hot rolling tray transport device arrived at the installation site in the middle of this month, and then began to install. The following is the installation site.
文章分类:
新闻中心
|